Certificates · Inspections · Property services0330 223 8858
Projects / SAP Assessment

SAP Assessment.
Know what is included.

Coordinate the required dwelling energy calculations with the design and completion stages of your project.

Quotation
Architectural planning
Illustrative property and service photography.

Understand this certificate or inspection

Costs and included quantities

The dwelling count, project stage, drawings and required reports determine the fee. Ask whether design, completion and revisions are included.

Is SAP the same as an existing-home EPC visit?

SAP calculations support the relevant dwelling design or construction project. Share the project requirements and stage; do not assume a standard existing-home appointment produces those reports.

Arranging the visit and report

Confirm access for each professional and the required report date. Combining services does not guarantee one simultaneous visit or the same turnaround for every output.

Official guidance: check the relevant requirements. Reviewed 8 November 2026.

Define the areas to be checked

Confirm which dwelling project and stage the calculation concerns. The location, project type and requested building-control documents help establish the appropriate assessment route.

Prepare the information

Provide the current plans and specifications rather than a mixture of superseded drawings. Construction, glazing and building-services information can materially affect the calculations.

Review the findings and scope

Agree whether the quotation covers design, completion or both, and identify the reports needed at each stage. Revisions and supporting evidence should be discussed before submission.

Keep the right records

Pass later design or construction changes to the assessor. Energy calculations form only part of the project requirements and do not automatically include other studies, site testing or regulatory approval.

BEFORE THE APPOINTMENT

Make the visit
easier to arrange.

Current plans, elevations, construction and services specifications, dwelling count and required outputs.

Tell the team about the deadline, occupier arrangements and any known restriction. Your preferred date needs confirmation before attendance.

What you receive

The calculations and reports specified in the accepted quotation.

Confirm the output in the accepted booking or quotation. Extra reports, repairs and unlisted work are separate.

Start with the property details

Before arranging
SAP Assessment.

Guidance reviewed 8 November 2026. Official information

What should I send?

Current plans, elevations, construction and services specifications, dwelling count and required outputs.

What is the price?

Quotation. Standard quantities are shown on the pricing and booking pages. Non-standard work needs review before a final price is agreed.

Is the visit confirmed when I complete the form?

No. Submitting a request or paying does not reserve a preferred visit. The team must agree the work, access and professional availability.

YOUR NEXT STEP

Let’s arrange the right work.

Share the property details and your preferred timing.

Start this service